1) Replace the roof of the cafeteria
wing $288,000
2) Replace windows in the High School
with energy
efficiency models $414,000
3) Replace leach fields behind the High
School that caused an odor problem $135,000
4) Replace interior classroom locks
$73,243
5) Replace vestibule doors $88,000
6) Reconstruct the gymnasium ceiling
$91,000
7) Expand the loading dock $46,000
1) Install natural gas service to the
building $110,000
2) Install natural gas-fired hot water
heating system $107,000
3) Replace cafeteria and library air
conditioning units
with natural gas-fired units $231,000
4) Replace 35-year-old broken ceiling
tiles $98,000
5) Replace the hot water heater in the
kitchen $78,000